Skip to main content

GNWT-DOT - MV2001E0038

construction and maintence activities for highways. airport infrastructure.  
Uploaded On or After
Uploaded On or Before
Displaying 1 - 20 of 20
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
MV01E38 Field Modification Apr.02-08.pdf (55.12 KB)
MV01E38 Authorization to Stage Equipment Mar.31-08.pdf (59.03 KB)
External Authorizations
Document Received/Sent Uploaded
MV02E38 Quarry Permit 2008QP0058 May30-08.pdf (123.16 KB)
MV01E38 Quarry Permit 2008QP0053 May29-08.pdf (128.67 KB)
MV01E38 Quarry Permit 2008QP0030 Apr.02-08.pdf (129.43 KB)
Final Plan and Clearance
Document Received/Sent Uploaded
MV2001E0038 - Final Clearance - Jun24-10.pdf (53.03 KB)
MV2001E0038 - Final Plan - Feb26-10.pdf (1.65 MB)
MV2001E0038 - Final Plan Request - Jan04-10.pdf (156.86 KB)
MV01E38 Final Plan Request Dec16-08.pdf (113.72 KB)
MV01E38 Final Plan Request Oct27-08.pdf (139.83 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2001E0038 - Staff Report - Jun24-10.pdf (31.25 KB)
MV01E38 JMR Gravel Haul Letter Apr.24-08.pdf (83.5 KB)
5. Reports and Studies
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2001E0038 - ENR letter to INAC -Response to Erosion Control Plan - Aug 4-09.pdf (7.15 MB)
MV2001E0038 - DOT - Response to Erosion Control Plan - Aug 4-09.pdf (49.7 KB)
MV2001E0038 - Proponents Response to Erosion Review - Aug 4-09.pdf (64.63 KB)
Inspection Reports
Document Received/Sent Uploaded
MV2001E0038 - Inspection Report - May21-09.pdf (5.86 MB)
MV01E38 May 11 Bridge Replacement Inspection July07-08.pdf (196.21 KB)
MV01E38 Inspection Report - Bobs Canyon Road July07-08.pdf (245.8 KB)
MV01E38 Inspection Report Apr.23-08.pdf (151.64 KB)
8. Closure and Reclamation
Interim Closure and Reclamation Plan
Document Received/Sent Uploaded
MV01E38 Final Plan Request Apr.23-08.pdf (155.93 KB)