NorthwesTel Inc. - G19H010
Status:
Issued
Authorization:
Land Use Permit
Activity:
Fuel Storage
Start:
January 27, 2020
Expiry:
January 26, 2025
Staff:
AlecSandra Macdonald
Land Use Permit for the purpose of fuel storage
at the existing North Vittrekwa tower site, accessed from km 0.465, Dempster
Highway #8.
Displaying 1 - 16 of 16
1. Permit - Licence - Other Issuances
Document | Received/Sent | Uploaded |
---|---|---|
G19H010 - Permit Issuance Letter - Jan27_20.pdf (28.41 KB) | ||
G19H010 - Reasons for Decision - Jan27_20.pdf (180.7 KB) | ||
G19H010 - Land Use Permit - Jan27_20.pdf (286.21 KB) |
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
G19H010 - LUP Application Package - Fuel Storage North Vittrekwa Tower - Aug21_19.docx.pdf (2.19 MB) | ||
G19H010 - Draft Land Use Permit - Dec10_19.pdf (234.11 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
G19H010 - Reviewer Comment Summary Table - Jan10_20.pdf (139.07 KB) | ||
G19H010 - GTC Dept of Cultural Heritage Comments - Dec13_19.pdf (464.6 KB) | ||
G19H010 - ENR Comments - Jan07_19.pdf (251.64 KB) | ||
G19H010 - Tetlit RRC Late Comments - Jan13_20.pdf (44.96 KB) | ||
G19H010 - Request for Comments - Fuel Stroage North Vittrekwa Tower - Dec10_19.pdf (141.16 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
G19H010 - Notification of Premilinary Screening Detemination - Jan16_20.pdf (29.59 KB) | ||
G19H010 - Premilinary Screening Report Form - Jan16_20.pdf (584.78 KB) |
5. Reports and Studies
Document | Received/Sent | Uploaded |
---|---|---|
G19H010 - GNWT Inspection Report - Jul14_21.pdf (390.21 KB) | ||
G19H010 - GNWT Lands Inspection Report - Jul22_20.pdf (1.61 MB) | ||
G19H010 - GNWT Lands Inspection Report - Apr08_20.pdf (1.41 MB) | ||
G19H010 - GNWT Lands Inspection Report - Feb18_20.pdf (1.25 MB) |