Skip to main content

GNWT-INF (Beaufort Delta) - G24L8-002

Culvert replacement at km 147.0 Dempster Highway #8 

​A new 3000 mm by 65.4 m culvert will be installed on the unnamed creek via a trenchless installation methodology, and the existing 2500 mm diameter culvert shall be decommissioned via grouting. The project will involve rerouting the creek at the crossing location to accommodate flow through the new culvert and avoid potential erosion and further degradation of the existing culvert. A tunnel boring machine machine will be used, which requires land use outside the highway right of way on Gwich'in Private Lands and Territorial Lands. See also Permit G24X002.


Uploaded On or After
Uploaded On or Before
Displaying 1 - 10 of 10
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
GNWT-INF - Dempster Culverts km 147.0 - Permit and Licence Issuance and RFD- Sep04_24.pdf (1.46 MB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
GNWT-INF - Dempster Culverts km 147.0 - Supporting Information - Jul12_24.pdf (18.54 MB)
GNWT-INF - Dempster Culverts km 147.0 - Application Form Licence -Jul12_24.pdf (480.05 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
GNWT-INF - Dempster Culverts km 147.0 - Draft Licence - Jul18_24.pdf (375.24 KB)
Preliminary Screening
Document Received/Sent Uploaded
GNWT-INF - Dempster Culverts km 147- Preliminary Screening and RFD - Aug 22_24.pdf (975.88 KB)
5. Reports and Studies
Designs and As-Builts
Document Received/Sent Uploaded
GNWT-INF - Dempster Culverts km 147.0 - Design Memo - Jul12_24.pdf (15.42 MB)
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
GNWT-INF - Dempster Culverts km 147.0 - Environmental Protection Plan - Jul12_24.pdf (3.35 MB)
Engagement Plan
Document Received/Sent Uploaded
GNWT-INF - Dempster Culverts km 147.0 - Engagement Plan and Record - Jul12_24.pdf (496.81 KB)
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
GNWT-INF - Dempster Culverts km 147.0 - Spill Contingency Plan - Jul12_24.pdf (425.99 KB)
Waste Management Plan
Document Received/Sent Uploaded
GNWT-INF - Dempster Culverts km 147.0 - Waste Management Plan - Jul12_24.pdf (692.68 KB)