Skip to main content

Imperial Oil Resources Ventures Ltd. - MV2003X0045

winter field geotechnical investigation program to assess the construction and engineering feasibility of a Mackenzie Valley pipeline system  

After a public process in early 2016, both the NEB and OROGO extended the sunset clause to December 31, 2022.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
2. Initial/Renewal Application
Environmental Assessment
Document Received/Sent Uploaded
MV2003X0045 - Final EA Decision - Geotechnical Program - Oct28-09.pdf (670.76 KB)
create link to EA03-009 on MVEIRB site_or post all docs from p.txt (0 bytes)
MV2003X0045 - Regarding EA - Consult to Modify-Jun3-05.pdf (1.11 MB)
MV2003X0045 - Response to SKDB - MVEIRB - Mar03-04.pdf (3.91 MB)
MV2003X0045 - Fax - Imperial Oil - PKFN Referral - Feb20-04.pdf (200.77 KB)