Skip to main content

Pine Point Holding Corporation - MV2006L2-0003

Pine Point Pilot Project (PPPP) - Proposed Pb/Zn pilot plant to confirm the potential to conduct full-scale mining of the remaining 34 known deposits. Produce a bulk sample of approximately 1,000,000 metric tonnes of lead-zinc ore over 12-15 months.
Refer also to Permit MV2011C0015.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
MV2006L2-0003 - Company Address Change - Aug26-11.pdf (63.44 KB)