Skip to main content

Canadian Natural Resources Limited - MV2010A0026

No camp required, will be utilizing open camp at Fort liard. Post a construction wellsite maintenance to include; Equipment mobilization, Pump out and backfill flare pit and on site campsite sumps, sill in slumped area around wellhead culvert, remove helipad, rillback topsoil and subsoil to teardrop ground well center, and reseed bare areas to enhance vegatation cover at both the wellsite and sump at campsite.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
5. Reports and Studies
Operations and Notifications
Document Received/Sent Uploaded
MV2010A0026 - File Update Request - Aug04-11.pdf (69.06 KB)