Canadian Natural Resources Limited - MV2010A0037

Post construction wellsite maintenance includes: Equipment Mobilization, pump out and backfill flare put and on site campsire sumps, sill in slumped area around wellhead culvert, remove helipad, roll back top soil and subsoil to teardrop around well centre, and reseed bare areas to enhance vegetation cover at both the wellsite and sump at campsite.      