Skip to main content

North Arrow Minerals Inc. - MV2010C0039

Geological, Drilling, Helicopter, and Expediting contracts will be awarded on a bid basis once land access is confirmed. Due to the project location contractors will most likely be Yellowknife based. During active periods of exploration, the property will typically have a work force of between 5 to 15 personnel. The project will consist of three program aspects that include airborne geophysical target ground checks, ground geophysical surveys and potentially diamond drilling. Logistical concerns and the availability of contractors will determine if these aspects will operate at the same time or not. Typically the project will include 1 project geologist, 1 camp cook/first aid attendant, 1 camp man, 1 geological assistant, 1 drill foreman, 2 drillers, 2 driller’s helpers, 1 helicopter pilot, 1 helicopter engineer and intermittently a 4 person geophysical crew. While the program is operating there is the possibility that additional management may visit the site for short periods.    

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
2. Initial/Renewal Application
Preliminary Screening
Document Received/Sent Uploaded
MV2010C0039 - North Arrow Minerals - Preliminary Screening Report - Sept07-10.pdf (119.83 KB)