Skip to main content

Jayhawk Frontier Exploration Ltd. - MV2010Q0040

Preliminary work required involves blasting, removing and stockpiling material for testing purposes. Additionally, a 10 acre area for a future equipment site will be cleared and leveled. A water well will also be drilled – no water will be utilized at this time, the water well is simply in preparation for use in the future and will be addressed in our future addition to this Land Use Permit after Phase One is complete. Water well will be 6.65 inches or 18 centimetres. A map outlining the captioned activities is attached for further perusal. Also, approximately 75 kilograms of explosives will be utilized for the blasting procedure. 10 metre holes will be drilled into the bench approximately one meter apart for a distance of 100 metres. 0.25kg of explosive will be placed in each hole. Explosives will be stored in a certified explosive-mag building located near the stockpile area. One additional 50 foot skid-mounted trailer will be setup on the future equipment site and will be utilized as an office.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
MV2010Q0040 - Final EIA - Vegitation and Habitat - Jun14-11.pdf (3.12 MB)
MV2010Q0040 - Final EIA For MVLWB - Jun13-11.pdf (5.41 MB)