Skip to main content

Enbridge Pipelines (NW) Inc. - MV2012L1-0006

This project is located approximately 10km NE of Wrigley, NT at Kp 305 on the Norman Wells to Zama pipeline, where the pipeline crosses Hodgson Creek, NT. Proposed remedial work includes; Maintenance of the existing 50m long berm,  consisting of increasing the thickness of the existing riprap erosion protection, construction of a series of five vanes that are located adjacent to and upstream of the existing berm. Construction equipment access to the site is only available during the winter months. Construction is proposed during the period from January to March 2013.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 15 of 15
2. Initial/Renewal Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2012L1-0006 and MV2012X0024 - Enbridge - Extension granted for response to reviewer comments - Apr8-13.pdf (50.67 KB)
MV2012L1-0006 - AANDC Security Estimate - Dec12-12.pdf (71.39 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge Response to Reviewer Comments - Dec11-12.pdf (475.55 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - Comments on Draft terms and conditions - Enbridge - Dec6-12.pdf (228.62 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - no comments on applications - ENR - Dec6-12.pdf (125.9 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - Comments on Application - PKFN - Dec6-12.pdf (125 KB)
MV2012X0024 and MV2012L1-0006 - Enbridge - Comment on application - EC - Dec6-12.pdf (519.5 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - Comments on Application - GNWT - DOT - Dec5-12.pdf (228.65 KB)
MV2012L1-0006 and MV2012X0024 - Request for extension to deadline for comments on applications - PKFN - Dec5-12.pdf (37.09 KB)
MV2012L1-0006 and MV2012X0024 - Enbridge - No Comment on Application - AANDC - Dec4-12.pdf (111.38 KB)
MV2012L1-0006 - Enbridge - Request for comments on application - Nov16-12.pdf (530.58 KB)
MV2012L1-0006 - Summary notes from Sept17-12 community meeeting in Wrigley - Oct15-12.pdf (104.87 KB)
MV2012L1-0006 - Enbridge notification of intent to apply for LUP for Hodgson Creek - Oct13-12.pdf (240.9 KB)
MV2012L1-0006 - Enbridge - Response to DFO comments on proposed Phase 3 remedial work - Oct9-12.pdf (76.01 KB)
MV2012L1-0006 - DFO comments on proposed Phase 3 remedial work - Oct9-12.pdf (113.54 KB)