Skip to main content

DIAND-GIANT - MV2012S0019

Giant Mine Freeze Optimination Study.Work will consist of land based drilling up to 135 holes using mud rotary, diamond drilling, and down the hole drilling methodologies, boring up to 45 holes using an auger, excavating 100 soil test pits, and associated activities such as fuel storage at the Giant Mine Site. This work is divided into four programs; (i) Freeze Optimization study
(ii) Design Support Drilling and Soils Testing (iii) A1, B1 and C1 Pit Channel Stability (iv) Undergraound Stability

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 5 of 5
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
MV2012S0019 - AANDC - Staff Report for Authorization of Chemicals - Conditions 17 in LUP - Dec05-12.pdf (211.52 KB)
MV2012S0019 - AANDC - Staff Report for new LUP Application - Sept13-12.pdf (649.61 KB)
MV2012S0019 - AANDC - CARD - Application Complete - Aug3-12.pdf (49.82 KB)
MV2012S0019 - Lat and longs for frill coordinates and project infratructure - Jul26-12.pdf (194.64 KB)
MV2012S0019 - New LUP Application - Jul25-12.pdf (9.05 MB)