Skip to main content

Borealis GeoPower - MV2012X0001

Linked to MV2012L4-0001 Borealis GeoPower proposes to drill two wells approximately 1.5 km southeast of the Hamlet of Fort Liard, NWT. The well location is L-55, located in the Grid Area 60° 20’ N, 123° 40’ W. The production well centre is 60° 14’ 36.21’’ N, 123° 26’ 02.47’’ W and is expected to be ~4,320 metres deep; the injection well centre is 60° 14’ 37.38’’ N, 123° 26’ 01.29’’ W and is expected to be ~1,500 metres deep.  If successful, Borealis further proposes to operate a geothermal power plant on the site.    

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
6. Management Plans
Assorted Management Plans
Document Received/Sent Uploaded
MV2012X0001 - Borealis Geopower - Overdue Plans and Fees - Staff Report - Dec5-12.pdf (247.09 KB)
MV2012X0001 - Borealis Geopower - Overdue Plans and Fees - Notice - Nov8-12.pdf (154.84 KB)
MV2012X0001 - Borealis Geopower - Overdue Plans and Fees - Request to Defer Plans - Nov8-12.pdf (1.31 MB)