GNWT-INF - MV2012X0015

Associated with Water Licence MV2003L8-0007   Continue with quarrying activities for approach and roadway construction materials for bridge approach; Continue with the ongoing operation of the temporary construction camp; Continue with the oeprations of the temporary conceret plant; Continue with the use and operation of the laydown areas; Maintain waste disposal; complete earthworks and roadway re-alignment for south aaproach; and  Bridge deck installation, paving, guard rail installation, and bridge signs and landscaping.  

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 2 of 2
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2012X0015 - GNWT-DOT - August 17 2015 Inspection Report - GNWT Lands - Aug21-15.pdf (1.69 MB)
MV2012X0015 - GNWT-DOT - Aug 17-15 Inspection Report - GNWT Lands - Aug21-15.pdf (1.69 MB)