Skip to main content

Kennady Diamonds - MV2013L2-0005

Bulk sampling of kimberlite using diamond drill rigs and trenching to obtain a 50 tonne sample for test milling and diamond recovery via DMS (Dense Media Separation). Possible future bulk sampling.

Refer also to Permit MV2013C0023 and MV2016C0030.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 1 of 1
5. Reports and Studies
Spill Reports
Document Received/Sent Uploaded
MV2013C0023 MV2013L2-0005 - KDI - 16-119 Fuel Spill - Internal Investigative Report - Aurora Geoscience - May11-16.pdf (3.34 MB)