GNWT-PWS - MV2013S0005
Status:
Closed
Authorization:
Land Use Permit
Activity:
Geotechnical
Start:
June 5, 2013
Expiry:
June 4, 2014
Staff:
NA
Permit is to conduct a geotechnical investigation. This investigation will potentially lead to the construction of a water reservoir and treatment plant at the site location, depending on the result of the investigation.
Scope of work includes;
Four geotechnical test borings, advanced up to 20m deep, depending on site conditions, using an auger drilling rig. The borehole locations will be field located using maps and a handheld GPS in order to provide suitable subsurface information;The soil stratigraphy will be classified at the time of drilling and soil samples will be collected for lab testing;
Standard Penetration Tests (SPTs) will be performed in the soil at 1.5m (5 Ft) intervals to obtain information on the type and strength of the materials encountered.
Displaying 1 - 8 of 8
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
MV2013S0005 - GNWT - PWS - Staff Report for New LUP Application - Jun6-13.pdf (469.61 KB) | ||
MV2013S0005 - GNWT-PWS - Draft LUP Conditions.pdf (66.74 KB) | ||
MV2013S0005 - GNWT - PWS - Complete application letter - Apr30-13.pdf (51.15 KB) | ||
MV2013S0005 - GNWT - PWS - Letter from PKFN supporting the project - Apr26-13.pdf (26.25 KB) | ||
MV2013S0005 - GNWT - PWS - Revised LUP Application - Apr26-13.pdf (1.92 MB) | ||
MV2013S0005 - GNWT - PWS - Incomplete application letter - Apr19-13.pdf (64.74 KB) | ||
MV2013S0005 - GNWT-PWS - New LUP Application - Apr17-13.pdf (804.07 KB) | ||
MV2013S0005 - GNWT-PWS - Spill Contingency Plan - Apr17-13.pdf (201.55 KB) |