Skip to main content

GNWT-PWS - MV2013S0005

​Permit is to conduct a geotechnical investigation. This investigation will potentially lead to the construction of a water reservoir and treatment plant at the site location, depending on the result of the investigation.

Scope of work includes;

Four geotechnical test borings, advanced up to 20m deep, depending on site conditions, using an auger drilling rig. The borehole locations will be field located using maps and a handheld GPS in order to provide suitable subsurface information;

The soil stratigraphy will be classified at the time of drilling and soil samples will be collected for lab testing;

Standard Penetration Tests (SPTs) will be performed in the soil at 1.5m (5 Ft) intervals to obtain information on the type and strength of the materials encountered.

 

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 3 of 3
2. Initial/Renewal Application
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2013S0005 - Distribution list - May2-13.docx (70.81 KB)
MV2013S0005 - GNWT-PWS - Distribution list - May2-13.pdf (1.34 MB)
MV2013S0005 - GNWT - PWS - Request for comments on New LUP Application - May2-13.pdf (2.39 MB)