Skip to main content

Joint Ventures Management Committee - MV2016X0032

​Dome Lake Maintenance Camp, located on the south shore of Dome Lake at approximately the 29km marker on the TCWR winter road. It is a staging point for all construction and maintenance support equipment and consists of a camp, sewage lagoon, water intake shed, watchman  trailer, equipment maintenance  building and warehousing  (including  generaton), cold storage shelter, watchman well site, Incinerator, fuel storage facility and quarries.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 8 of 8
6. Management Plans
Spill - Contingency - Emergency Response
Document Received/Sent Uploaded
Joint Venture Management Committee - Emergency Response and Spill Contingency Plan - Jan29_22.pdf (2.31 MB)
MV2016X0032 - JVMC - 2019 TCWR Emergency Response Plan - Feb26-19.pdf (1.71 MB)
MV2016X0032 - JVMC - 2019 TCWR Emergency Response Plan - Jan2-19.pdf (1.71 MB)
MV2016X0032 - JVMC - 2018 TCWR Emergency Response Plan - Jan29-18.pdf (2.5 MB)
MV2016X0032 - JVMC - 2018 TCWR Emergency Response Plan - Jan25-18.pdf (2.5 MB)
MV2016X0032 - JVMC - 2018 TCWR Emergency Response Plan - Jan18-18.pdf (3.01 MB)
MV2016X0032 - JVMC - Emergency Response Plan - Amendment V15-2 - Jan24-17.pdf (3.16 MB)
MV2016X0032 - JVMC - Emergency Response Plan 2017 - Jan11-17.pdf (3.19 MB)