Skip to main content

TDC Contracting Ltd. - MV2018Q0019

​Heavy equipment will be used to quarry, crush, stock pile and haul granular material from the site to Fort Smith, NT and area.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 6 of 6
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
TDC Contracting Ltd. - Inspection Report - 2024-04-24 - May1_24.pdf (2.86 MB)
TDC Contracting - Inspection Report - May 31, 2023 - Jul4_23.pdf (2.81 MB)
TDC Contracting - Inspection Report - May 27, 2022 - Jun8_22.pdf (1.52 MB)
MV2018Q0019 - TDC Contracting Ltd. - Quarry Inspection Report - May 21-21.pdf (11.06 MB)
MV2018Q0019 - TDC Constracting - Inspection Report for June 6 2019 - GNWT Lands - Jun14-19.pdf (970.13 KB)
Operations and Notifications
Document Received/Sent Uploaded
MV2018Q0019 - TDC Contracting Ltd. - Quarry Permit Application Acknowledgement - Oct17-19.pdf (218.4 KB)