Skip to main content

Northwest Territories Power Corporation - MV2020X0004

​Construction of replacement support facilities and decommissioning of existing facilities as part of theTaltson Hydroelectris Facility overhaul.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 17 of 17
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
NTPC - Taltson - Inspection Report - February 20, 2024 - Mar 2_24.pdf (4.99 MB)
NTPC - Taltson - Inspection Report - July 13, 2023 - Aug8_23.pdf (5.97 MB)
NTPC - Taltson - Inspection Report - May 26, 2022 - Jun8_22.pdf (3.98 MB)
NTPC - Taltson - Inspection Report - July 2021 - Aug16_21.pdf (11.62 MB)
NTPC - Taltson Facility Upgrades - Inspection Report - July 2021 - Aug13_21.pdf (11.62 MB)
NTPC - Taltson Upgrades - Notification of Inspection - Email Correspondence - Aug6_21.pdf (160.85 KB)
Operations and Notifications
Document Received/Sent Uploaded
NTPC - Taltson - Camp Water Intake - End of Work Notification - Aug2_22.pdf (116.86 KB)
NTPC - Taltson - Turbidity Curtain Installation Complete - Jul25_22.pdf (109.11 KB)
NTPC - Taltson Facility Upgrades - 2022 Start-up Notification - Apr22_22.pdf (383.96 KB)
NTPC - Taltson - Notification - Amendment and modification under WL MV2011L4-0002 - Apr12_22.pdf (359.34 KB)
NTPC - Taltson Upgrades - Notification of Standard Operating Procedure - Aug6_21.pdf (797.69 KB)
NTPC - Taltson Upgrades - Temporary Water Line Correspondence - Mar23-21.pdf (3.85 MB)
NTPC - Taltson Upgrades - Temporary Water Line Figure - Mar23-21.pdf (617.79 KB)
MV2020X0004 - NTPC - Taltson Upgrades - Staging Notification - Feb15-21.pdf (837.79 KB)
Other
Document Received/Sent Uploaded
NTPC - Taltson - Type A Permit - SDS Aderex-Dust Control.pdf (8.1 MB)
NTPC - Taltson - Wildlife Survey - Feb4_21.pdf (3.01 MB)
MV2020X0004 - NTPC - Taltson - Wildlife Survey - July2020.pdf (8.86 MB)