Skip to main content

Ka'a' Gee Tu First Nation - MV2021X0014

​Using ballast rock to upgrade the exsisting break water system in the Kakisa River to create an area to establish a safe boat launch and floating dock system. 

No water licence is required.

Uploaded On or After
Uploaded On or Before
Displaying 1 - 15 of 15
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
KTFN – Breakwater Upgrade – Type A Land Use Permit - Issuance - Sep7_21.pdf (697.72 KB)
Ka ‘a’ Gee Tu First Nation – Breakwater Upgrades – Issuance - Staff Report and Comments - Aug25_21.pdf (837.75 KB)
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
KTFN - Breakwater Upgrades - Receipt - Application Fee - Jul20_21.pdf (36.53 KB)
KTFN - Breakwater Upgrade - Capital Plan 2021-2022 - Jul12_21.xlsx (97.18 KB)
KTFN - Breakwater Upgrade - 2021 Capital Motion - Jul12_214.pdf (91.69 KB)
KTFN - Breakwater Upgrades - Incomplete Letter - July9_21.pdf (211.74 KB)
KTFN - Breakwater Upgrades - Application Form - Jul5_21.pdf (1.79 MB)
KTFN - Breakwater Upgrades - DFO Letter - Jul5_21.pdf (235.56 KB)
KTFN - Breakwater Upgrades - Spill Contingency Plan - Jul6_21.docx (1.33 MB)
KTFN - Breakwater Upgrades - Waste Management Plan - Jul6_21.docx (392.1 KB)
KTFN - Breakwater Upgrades - Map 1 - Jul5_21.jpg (185.12 KB)
KTFN - Breakwater Upgrades - Map 2 - Jul5_21.jpg (172.66 KB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
KTFN - Breakwater Upgrade - Draft Conditions - Jul13_21.docx (639.49 KB)
Preliminary Screening
Document Received/Sent Uploaded
KTFN - Preliminary Screening Determination and Reasons for Decision - Aug25_21.pdf (255.55 KB)
KTFN - Notification - Preliminary Screening Determination - Aug25_21.pdf (164.32 KB)