Skip to main content

Northwest Territories Power Corporation - N1L1-1632

Jackfish Lake Diesel Plant, Yellowknife, NT - water use for cooling power plant systems.  

Renewed into MV2019L1-0001.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 4 of 4
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
N1L1-1632 - NTPC - Jackfish - July 16 2015 Inspection Report - GNWT ENR - Sept10-15.pdf (350.04 KB)
N1L1-1632 - NTPC - Jackfish Lake - May 20 2014 Inspection Report - GNWT Lands - Aug1-14.pdf (871.84 KB)
N1L1-1632 - Inspection Report - Jul27-11.pdf (1.8 MB)
N1L1-1632 Inspection Report Sept02-08.pdf (380.48 KB)