Skip to main content

Hamlet of Tulita - S16L3-001

​Water Licence Renewal for the Hamlet of Tulita. This application is for use of water from the Great Bear River for community use, disposal of waste at the Solid Waste Landfill, and disposal of wastewater at the Taylor’s Lake Sewage Lagoon.

Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 15 of 15
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
S16L3-001 - Hamlet of Tulita - Water Licence Renewal - Staff Report - Oct 24_16.pdf (837.32 KB)
S16L3-001 - Hamlet of Tulita - DRAFT WL Terms and Conditions.pdf (571.6 KB)
S16L3-001 - Hamlet of Tulita Overview Map - Sept 16_16.pdf (1.86 MB)
S16L3-001 - Tulita - Water Licence Renewal - Cover Letter - Sep 6_16.pdf (52.89 KB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix A - Water Licence Application and Fee - Sep 6_16.pdf (215.46 KB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix B - 2015 Annual Report - Sep 6_16.pdf (1.32 MB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix C - Waste Management Plan - Sep 6_16.pdf (1.32 MB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix D - Hazardous Waste Manifest and Action Plan - Sep 6_16.pdf (1.34 MB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix E - As-Built Drawings - Sep 6_16.pdf (8.06 MB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix F - Soild Waste Facility Operation and Maintenance Plan - Sep 6_16.pdf (2.3 MB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix G - Sewage Lagoon Operation and Maintenance Plan - Sep 6_16.pdf (2.96 MB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix H - Water Treatment Plant Operation and Maintenance Plan - Sep 6_16.pdf (55.29 MB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix I - Spill Contingency Plan - Sep 6_16.pdf (1.61 MB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix J - Waste Disposal Facilities Fencing Action Plan - Aug 4_16.pdf (2.42 MB)
S16L3-001 - Tulita - Water Licence Renewal - Appendix K - Waste Disposal Facilities Flow Pathway Study - Sep 6_16.pdf (78.61 KB)