Enbridge Pipelines (NW) Inc. is proposing to conduct Line 21 pipeline maintenance digs within the Saline River (KP 180.168 and KP 180.280). All excavation activities will be contained within Enbridge's existing right-of-way (MV2013P0011) however the Project will involve a watercourse crossing and there is the potential for a channel diversion.
Additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities. The associated application for a Type A Land Use Permit is S17P-005.
Additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities. The associated application for a Type A Land Use Permit is S17P-005.
Displaying 1 - 19 of 19
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Enbridge - Staff Report 1 - Feb 7_18.pdf (815.92 KB) | ||
S17L1-004 S17P-005 - Enbridge - Line 21 Integrity Dig Saline River - Review Summary Table with Attachments - Jan 27_18.pdf (1.35 MB) | ||
S17L1-004 S17P-005 - Enbridge Responses to Review Comments and Draft Conditions with Attachments - Jan 25_18.pdf (405.45 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Enbridge - Board Decision WL and LUP Application - Further Study Required - Jan 29_18.pdf (96.56 KB) |