Enbridge Pipelines (NW) Inc. - S17L1-004
Status:
Expired
Authorization:
Licence
Activity:
Industrial
Start:
February 7, 2018
Expiry:
February 6, 2020
Staff:
Bonnie Bergsma
Enbridge Pipelines (NW) Inc. is proposing to conduct Line 21 pipeline maintenance digs within the Saline River (KP 180.168 and KP 180.280). All excavation activities will be contained within Enbridge's existing right-of-way (MV2013P0011) however the Project will involve a watercourse crossing and there is the potential for a channel diversion.
Additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities. The associated application for a Type A Land Use Permit is S17P-005.
Additional off-right-of-way land is required for temporary work space to accommodate vehicle and equipment staging, temporary material storage and excavation isolation activities. The associated application for a Type A Land Use Permit is S17P-005.
Displaying 1 - 7 of 7
6. Management Plans
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - revised WMP and SECP - Staff Conformity Confirmation - Feb 16_18.pdf (334.61 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Enbridge - Engagement plan - Dec 22_17.pdf (162.1 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 - Enbridge - Revised Erosion and Sediment Control Plan - Version 1.1 - Feb 15_18.pdf (3.13 MB) | ||
S17L1-004 S17P-005 - Enbridge - Sediment and Erosion Control Plan - Dec 22_17.pdf (3.73 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Enbridge - Spill Contingency Plan - Version 1.1 - Feb 16_18.pdf (12.6 MB) | ||
S17L1-004 S17P-005 - Staff Confirmation of Conformity - Spill Contingency Plan - Feb 19_18.pdf (283.9 KB) |
Document | Received/Sent | Uploaded |
---|---|---|
S17L1-004 S17P-005 - Enbridge - Revised Waste Management Plan - Version 1.1 - Feb 15_18.pdf (3.35 MB) |