Enbridge Pipelines (NW) Inc. - S20P-003
- All maps from Natural Resources Canada
200 km
Status:
Issued
Authorization:
Land Use Permit
Activity:
Pipeline
Start:
September 17, 2020
Expiry:
September 16, 2025
Staff:
Bonnie Bergsma
Enbridge Pipelines (NW) Inc. (Enbridge) is proposing to replace a segment of the Line 21 pipeline southeast of kilometre post (KP) 158 near Little Smith Creek in the Northwest Territories (NWT). A Permit (S20P-003) is required for the use of land for camps, laydown yard, barge landing and temporary workspace, fuel storage, use of heavy equipment and a Licence (S20L1-001) for use of water and waste disposal.
Displaying 1 - 19 of 19
2. Initial/Renewal Application
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Enbridge EPP v. 1.1 - Staff Report - Dec 22_20.pdf (800.51 KB) | ||
S20P-003 -Enbridge Line 21 Replacement - KP158 - Staff Report - Aug 28 - Sep 17_20.pdf (2.88 MB) | ||
S20P-003 -Enbridge Line 21 Review Comment Table and attached correspondence - Sep 17_20.pdf (1.52 MB) | ||
S20P-003 - Enbridge Line 21 Pipeline Replacement Project - Staff Report - Aug -27_20.pdf.pdf (5.35 MB) |
Document | Received/Sent | Uploaded |
---|---|---|
S20P-003 - Enbridge Line 21 - Preliminary Screening RFD - Aug 28_20.pdf (3.91 MB) |