Skip to main content

GNWT-INF - W2025X0003

​to replace the Dehk’è Frank Channel Bridge (Project) on the Highway-3 corridor. Project Activities include: 

  • construction and operation of a temporary camp and a laydown area;
  • re-alignment of the Right-of-Way
  • replacement of the existing bridge
  • installation of temporary drainage system and construction of permanent drainage system with new culverts
  • construction of temporary ice bridges
  • rock blasting to construct temporary accesses to build new bridge and deconstruct the other.


Documents

Uploaded On or After
Uploaded On or Before
Displaying 1 - 12 of 12
2. Initial/Renewal Application
Application and Related Docs
Document Received/Sent Uploaded
Dehk’è Frank Channel Bridge - LUP Application - Newspaper Notice of Application - May 19_25.pdf (1.33 MB)
Dehk’è Frank Channel Bridge - LUP Application - PWNHC AOA Review - May 14_25.pdf (126.94 KB)
Dehk’è Frank Channel Bridge - LUP Application - Quarry Permit - May 2_25.pdf (14.74 MB)
Dehk’è Frank Channel Bridge - LUP Application - PSD - Appendix D - May 2_25.pdf (15.04 MB)
Dehk’è Frank Channel Bridge - LUP Application - PSD - Appendix B - Part 3 - May 2_25.pdf (20.67 MB)
Dehk’è Frank Channel Bridge - LUP Application - PSD - Appendix B - Part 2 - May 2_25.pdf (18.31 MB)
Dehk’è Frank Channel Bridge - LUP Application - Project Screening Document - May 2_25.pdf (14.25 MB)
Dehk’è Frank Channel Bridge - LUP Application - PSD - Appendix C - May 2_25.pdf (25.82 MB)
Dehk’è Frank Channel Bridge - LUP Application - PSD - Appendix B - Part 1 - May 2_25.pdf (11.62 MB)
Dehk’è Frank Channel Bridge - LUP Application - PSD - Appendix A Design Drawings - May 2_25.pdf (26.43 MB)
Dehk’è Frank Channel Bridge - LUP Application - Letters of Support - May 2_25.pdf (157.2 KB)
Dehk’è Frank Channel Bridge - LUP Application Form - May 2_25.pdf (817.13 KB)