Skip to main content

GNWT-AC (Yellowknife Campus) - MV2013X0003

​To provide driver training and mine timbering experience to Northern Aboriginal students using underground mining equipment. Training is a component of the Underground Miner Training Program offered by the College twice annually. The program has the support of the three diamond mining complanies of the NWT all of whom have hired graduates of this program and will continue to do so. Training will be undertaken at teh GNWT permitted quarry located at KM 11 on Ingraham Trail. The college works in partnership with the Mine Training Society of the NWT and has been conducint this training at this location for the past number of years under the GNWT permit. It was determined that training was not a part of the scope of work identified for the permit and therefore the College was asked to apply independantly. The College simply moves granular material that has been stockpiled by the GNWT from one location to another and back again. A 16X16X100 timber structure will be built on site to replicate timbering conditions found in an underground mining situation. There is limited to no fuel being stored, very little waste generation and minimal to no impact to the surrounding environment. No camp will be established. A 8X12 shed will be used onsite and serve as a storage, shelter and meal facility,

Uploaded On or After
Uploaded On or Before
Displaying 1 - 23 of 23
1. Permit - Licence - Other Issuances
All Issuances
Document Received/Sent Uploaded
MV2013X0003 - GNWT - Aurora College - Final Clearance Letter - Oct9-18.pdf (155.4 KB)
MV2013X0003 - Aurora College - Issuance Letter with Conditions - May15-13.pdf (674.99 KB)
Final Plan and Clearance
Document Received/Sent Uploaded
MV2013X0003 - GNWT - Aurora College - Final Clearance - Staff Report - Oct4-18.pdf (171.37 KB)
MV2013X0003 - GNWT-Aurora College - Final Plan and Clearance Recommendation - GNWT Lands - Jul20-18.pdf (369.14 KB)
Security and Water Use Fees
Document Received/Sent Uploaded
MV2013X0003 - Aurora College - YK Campus - Fee for new LUP Application - Apr3-13.pdf (61.3 KB)
2. Initial/Renewal Application
Document Received/Sent Uploaded
MV2013X0003 - Aurora College - Request for review and comments - Apr9-13.pdf (432.29 KB)
Application and Related Docs
Document Received/Sent Uploaded
MV2013X0003 - Aurora College - Staff Report for New Type A LUP - May15-13.pdf (545.77 KB)
MV2013X0003 - Aurora College - LUP Application - Waste Management Plan - Updated - May6-13.pdf (156.82 KB)
MV2013X0003 - Aurora College - LUP Application - Spill Contingency Plan - Updated - May6-13.pdf (253.46 KB)
MV2013X0003 - Aurora College - LUP Application - Draft Conditions - April 8-13.pdf (381.52 KB)
MV2012X0003 - Aurora College - LUP Application - Engagement - Dene Nation support - Apr8-13.pdf (81.44 KB)
MV2013X0003 - Aurora College - LUP Application - Engagement - Follow up phone calls - Apr8-13.pdf (40.01 KB)
MV2013X0003 - Aurora College - LUP Application - Deemed Complete - Apr8-13.pdf (50.68 KB)
MV2013X0003 - Aurora College - NEW LUP Application - Apr3-13.pdf (2.25 MB)
Consultations - Reviews - Work Plans
Document Received/Sent Uploaded
MV2013X0003 - Aurora College - LUP Application - NSMA letter - April 29-13.pdf (318.75 KB)
MV2013X0003 - Aurora College - LUP Application - Distribution List - April 8-13.pdf (93.9 KB)
Final Plan and Clearance
Document Received/Sent Uploaded
MV2013X0003 - Aurora College - Yellowknife Campus - Final Plan Request - June28_18.pdf (153.85 KB)
Preliminary Screening
Document Received/Sent Uploaded
MV2013X0003 - Aurora College - Preliminary Screening Report - May15-13.pdf (267.72 KB)
5. Reports and Studies
Inspection Reports
Document Received/Sent Uploaded
MV2013X0003 - GNWT-Aurora College - October 16 2015 Inspection Report - Oct19-15.pdf (1.43 MB)
MV2013X0003 - Aurora College - June 18 2014 Inspection Report - GNWT Lands - Jun18-14.pdf (679.56 KB)
MV2013X0003 - Aurora College - YK Campus - November 19 2013 Inspection Report - Nov25-13.pdf (950.03 KB)
MV2013X0003 - Aurora College - YK Campus - Setptemeber 18 2013 Inspection Report - Oct8-13.pdf (665.23 KB)
Operations and Notifications
Document Received/Sent Uploaded
MV2013X0003 - Aurora College - Field Contacts - May22-13.pdf (36.92 KB)